CRRC Zhuzhou Institute

CESS-Smart PV ESS-50/100

Industrial & Commercial AC Block

Updated Aug 28, 2026

Industrial & Commercial AC Block Updated Aug 28, 2026

CRRC Zhuzhou Institute CESS-Smart PV ESS-50/100 is an LFP battery energy storage system for commercial and industrial use, with 100.35 kWh nominal energy supplied as an AC block. It uses fan cooling, weighs 1.5 tonnes (3,307 lb), and has a 296.8 to 408.8 V DC window.

Use Cases

Use behind the meter is consistent with the specifications of CRRC Zhuzhou Institute CESS-Smart PV ESS-50/100. Its energy capacity is within the commercial and industrial range. It connects at 380 V and is certified to low-voltage grid connection rules (VDE 4105, NRS 097-2-1).

Capabilities

About 2.01 h of storage at full power, calculated from 100.35 kWh and 50 kW, makes CRRC Zhuzhou Institute CESS-Smart PV ESS-50/100 a candidate for capacity value, being counted on as supply when the network is tight. Its AC block includes the inverter and points to renewable colocation, operating alongside a wind or solar plant on one site.

Nominal energy

0.1 MWh

Rated AC power

0.05 MW

What does this system typically cost?

BESSBASE.com user price estimates for CESS-Smart PV ESS-50/100 by CRRC Zhuzhou Institute and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.

Sign up to see and submit price estimates.

BESSBASE.com users can privately compare and submit prices for CESS-Smart PV ESS-50/100 by CRRC Zhuzhou Institute and similar systems across 20+ international markets.

Energy & Power

Nominal energy
0.1 MWh
Rated AC power
0.05 MW

Architecture

Installation
Outdoor-capable

DC Side

Nominal DC voltage
358.4 V
DC voltage range
296.8 – 408.8 V

AC Side

AC voltage
380 V
AC voltage parameters
3L/N/PE
Rated AC current
83A
Grid frequency
50 Hz / 60 Hz

Physical & Footprint

Dimensions (W × D × H)
1,530 × 1,260 × 1,740 mm
Weight
1.5 t

Battery Cells

Chemistry
LFP
Cell supplier
Hithium

Lifespan

Protection

Ingress protection (IP)
IP54
Corrosion protection
C4
Fire & safety
Aerosol

Full Specification Sheet

Members

The rest of this spec sheet is for members

3 more specification blocks on this product. Create a free account to see every field on every product.

You stay on this page — it fills in as soon as you are signed in.

Plant Round-Trip Efficiency

Duration
energy ÷ power 2 h
0.5C
—
State of health
new system
as-new
—
DC block
typical @2 h
round trip @ 2 h
94 %
PCS (DC/AC)
typical default
each way
97.02 %
Transformer LV/MV
typical default
each way
98.01 %
Transformer MV/HV
typical default
each way
98.01 %
Cables (all segments)
typical default
each way
98.8 %
Auxiliary power (plant's own consumption)
typical default
−4.3 pts
Plant Round-Trip Efficiency at the Point of Interconnection
82.2 %
40 % 100 %
1.216 MWh charged for every 1 MWh discharged
Both measured at the grid connection point. The plant's own power use is already included in the losses.

The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.

Site Space Required

single unit clearance 3 m / side
54.7m² total site area · 1 × 1
588 ft²0.0055 ha0.014 acres546.7 m² / MWh5,884 ft² / MWh
Unit W × D
1.53 × 1.26 m
5.02 × 4.13 ft
Site envelope
7.53 × 7.26 m
24.7 × 23.82 ft
Per unit
54.7 m²
Installed energy
0.1 MWh
1 × nameplate
Units1
Per row1
Clearance between unitsShared

Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.

Clearance allowance
6m per axis · 3 m per side
19.69 ft per axis · 9.84 ft per side

Single unit — matches the stored area_sqm convention.

More CRRC Zhuzhou Institute Systems

16
CompareLogoVendorSystemEnergyPowerDurationBattery CellOpen
CRRC Zhuzhou Institute33.3 MWh16.67 MW AC2 h 0.5CLFP
CRRC Zhuzhou Institute6.9 MWh— 2 h 0.5CLFP 287 Ah · Prismatic
CRRC Zhuzhou Institute6.25 MWh— 2–4 h 0.5–0.25C · flexLFP 287 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L5016-EU-0.5C DC Block · 20 ft container
5.02 MWh— 2 h 0.5CLFP 314 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L5016-US-0.25C DC Block · 20 ft container
5.02 MWh— 4 h 0.25CLFP 314 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L5016-EU-0.25C DC Block · 20 ft container
5.02 MWh— 4 h 0.25CLFP 314 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L5016-STR-0.5C DC Block · 20 ft container
5.02 MWh— 2 h 0.5CLFP 314 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L5016-STR-0.25C DC Block · 20 ft container
5.02 MWh— 4 h 0.25CLFP 314 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L5016-US-0.5C DC Block · 20 ft container
5.02 MWh— 2 h 0.5CLFP 314 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L3727-US-0.5C DC Block · 20 ft container
3.73 MWh— 2 h 0.5CLFP 280 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-L3727-EU-0.5C DC Block · 20 ft container
3.73 MWh— 2 h 0.5CLFP 280 Ah · Prismatic
CRRC Zhuzhou Institute
CESS-Smart PV ESS-50/100 AC Block · cabinet
0.1 MWh0.05 MW AC— LFP

About the Vendor

CRRC Zhuzhou Institute Tier-1 Listed Company

Founded in 1959 and based in Zhuzhou, Hunan, CRRC Zhuzhou Institute began as the Ministry of Railways’ Zhuzhou Electric Locomotive Research Institute. It is now a wholly owned CRRC subsidiary that makes integrated energy storage systems for grid use, and its battery container projects total more than 1 GWh, including 6.25 MWh systems in high renewable regions of northwest China.

Production scale 20+ GWh
Company size Major (10000+)
Vertical integration Medium
Bankability Overall Positive

How to Read the Product Page

This profile of CESS-Smart PV ESS-50/100 by CRRC Zhuzhou Institute is assembled exclusively from public data to support early-stage screening and requires additional due diligence.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

Report an error

BESSBASE

BESSBASE is a screening intelligence platform used by asset owners, developers, and banks to assess industrial and grid-scale battery storage solutions.

  • X
  • LinkedIn

© 2026 BESSBASE.com by BESSBASE LLC. All rights reserved.