GEN 8 Scalable Platform: 10MWh Energy Storage System
Grid-ScaleDC BlockContainerizedUpdated Aug 28, 2026
Envision Energy’s GEN 8 Scalable Platform is a containerized LFP system for utility-scale use. It provides 10 MWh nominal energy and about a 4-hour duration as a DC block. The unit uses liquid cooling with 750 Ah prismatic cells and weighs 80 tonnes (176,370 lb).
Use Cases
Use in front of the meter directly on the electricity network is consistent with the specifications of Envision Energy GEN 8 Scalable Platform: 10MWh Energy Storage System. Its energy capacity is within the utility-scale range.
Capabilities
A listed 4 h configuration makes Envision Energy GEN 8 Scalable Platform: 10MWh Energy Storage System a candidate for energy shifting, charging at one time and discharging hours later. Its shortest listed configuration is 4 h, and that configuration points to capacity value, counting as firm supply toward a network's peak needs. The specifications suggest renewable colocation, sitting next to a wind or solar plant and sharing its grid connection, as its DC block connects through a separate inverter.
Nominal energy
10MWh
Duration
4flexible
C / P rate
0.25P
What does this system typically cost?
BESSBASE.com user price estimates for GEN 8 Scalable Platform: 10MWh Energy Storage System by Envision Energy and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for GEN 8 Scalable Platform: 10MWh Energy Storage System by Envision Energy and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More Envision Energy Systems
4| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| Envision Energy | GEN 8 Scalable Platform: 10MWh Energy Storage SystemDC Block | 10MWh | — | 4h0.25C · flex | LFP750 Ah · Prismatic Next-Gen 500+ Ah | |||
| Envision Energy | 5 MWh String PCS Power ContainerAC Block · 20 ft container | 5.03MWh | 2.52MWAC | —0.5C | LFP315 Ah · Prismatic | |||
| Envision Energy | DC Container ProductsDC Block · 20 ft container | 5.03MWh | — | 2–4h0.5C · flex | LFP315 Ah · Prismatic | |||
| Envision Energy | Smart Liquid Cooled Energy Storage System DC Cabinet ProductsDC Block · cabinet | 0.41MWh | — | 2–4h0.5C · flex | LFP305 Ah · Prismatic |
About the Vendor
Envision Energy, founded in 2007 in Jiangyin, Jiangsu, makes and integrates battery energy storage systems for grid-scale projects. It has more than 50 GWh in cumulative energy storage orders across more than 400 projects in 10 countries, and it completed a 12.8 GWh utility-scale energy storage cluster in Inner Mongolia, China.
How to Read the Product Page
This profile of GEN 8 Scalable Platform: 10MWh Energy Storage System by Envision Energy is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.