LG Energy Solution Vertech

JF2 4HR DC LINK

Grid-ScaleDC BlockContainerized

Updated Aug 27, 2026

Grid-ScaleDC BlockContainerizedUpdated Aug 27, 2026

LG Energy Solution Vertech JF2 4HR DC LINK is a containerized LFP battery energy storage system with 5.11 MWh nominal energy and about a 4-hour duration in a DC block. It uses liquid cooling and weighs 48 tonnes (105,822 lb).

Use Cases

Use in front of the meter directly on the electricity network is consistent with the specifications of LG Energy Solution Vertech JF2 4HR DC LINK. By energy capacity, it belongs to the utility-scale class.

Capabilities

Its DC block connects through a separate inverter, which points to renewable colocation, operating alongside a wind or solar plant on one site. Its listed configuration of 4 h makes LG Energy Solution Vertech JF2 4HR DC LINK a candidate for energy shifting, taking in power and returning it hours later. The specifications suggest capacity value, being counted on as supply when the network is tight, and its shortest listed configuration is 4 h.

Nominal energy

5.11MWh

Duration

4hour

C / P rate

0.25P

What does this system typically cost?

BESSBASE.com user price estimates for JF2 4HR DC LINK by LG Energy Solution Vertech and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.

Sign up to see and submit price estimates.

BESSBASE.com users can privately compare and submit prices for JF2 4HR DC LINK by LG Energy Solution Vertech and similar systems across 20+ international markets.

Energy & Power

Nominal energy
5.11MWh
Duration
4 hour
C / P rate
0.25 P

Architecture

Installation
Outdoor-capable

DC Side

Nominal DC voltage
1,134 V
DC voltage range
1,134 – 1,499 V

AC Side

Physical & Footprint

Dimensions (W × D × H)
7,020 × 2,570 × 2,900mm
Weight
48t

Battery Cells

Chemistry
LFP
Cell supplier
LG Energy Solution (in-house)

Lifespan

Protection

Enclosure protection
IP55
Seismic rating
SDS 1.2g
Fire & safety
Gas detection and active venting system, fire detection and alarm system

Full Specification Sheet

Members

The rest of this spec sheet is for members

3 more specification blocks on this product. Create a free account to see every field on every product.

You stay on this page — it fills in as soon as you are signed in.

Plant Round-Trip Efficiency

Duration
duration 4 h
0.25C
—
State of health
new system
as-new
—
DC block
typical @4 h
round trip @ 4 h
94 %
PCS (DC/AC)
typical default
each way
97.02 %
Transformer LV/MV
typical default
each way
98.01 %
Transformer MV/HV
typical default
each way
98.01 %
Cables (all segments)
typical default
each way
98.8 %
Auxiliary power (plant's own consumption)
typical default
−4.3 pts
Plant Round-Trip Efficiency at the Point of Interconnection
82.2 %
40 %100 %
1.216MWh charged for every 1 MWh discharged
Both measured at the grid connection point. The plant's own power use is already included in the losses.

The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.

Site Space Required

single unit clearance 3 m / side
111.6m² total site area · 1 × 1
1,201 ft²0.0112 ha0.028 acres21.8 m² / MWh235 ft² / MWh
Unit W × D
7.02 × 2.57 m
23.03 × 8.43 ft
Site envelope
13.02 × 8.57 m
42.72 × 28.12 ft
Per unit
111.6 m²
Installed energy
5.11 MWh
1 × nameplate
Units1
Per row1
Clearance between unitsShared

Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.

Clearance allowance
6m per axis · 3 m per side
19.69 ft per axis · 9.84 ft per side

Single unit — matches the stored area_sqm convention.

More LG Energy Solution Vertech Systems

3
CompareLogoVendorSystemEnergyPowerDurationBattery CellOpen
LG Energy Solution Vertech
JF2 4HR DC LINKDC Block
5.11MWh—4h0.25CLFP
LG Energy Solution Vertech5.11MWh2.55MWAC2h0.5CLFP
LG Energy Solution Vertech5.11MWh1.32MWAC4h0.25CLFP

About the Vendor

LG Energy Solution VertechTier-2Listed Company

LG Energy Solution Vertech, founded in 2017 and based in Westborough, Massachusetts, is LG Energy Solution’s US energy storage division. LG Energy Solution bought the company in 2022 and added US ESS system integration and battery installation to its manufacturing business, with 19 GWh of integrated US energy storage projects installed, under construction, or under contract, and 30 GWh of energy storage batteries deployed, ordered, or under contract worldwide.

Production scale20+ GWh
Company sizeMiddle (300-1000)
Vertical integrationHigh
BankabilityNeutral

How to Read the Product Page

This profile of JF2 4HR DC LINK by LG Energy Solution Vertech is assembled exclusively from public data to support early-stage screening and requires additional due diligence.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

BESSBASE.COM

Your trusted database of battery energy storage systems

© 2026 BESSBASE.com. All rights reserved.