JinkoSolar SunGiga All in One JKS-215KLAA-100PLAA is an LFP battery energy storage system for commercial and industrial use with 215 kWh nominal energy, about a 2-hour duration, and an AC block design. It uses liquid cooling with water or glycol, contains 280 Ah prismatic cells, and weighs 2.3 tonnes (5,071 lb).
Use Cases
JinkoSolar SunGiga All in One JKS-215KLAA-100PLAA has nominal energy in the commercial and industrial size class. It connects at 400 V, a low-voltage AC connection. These specifications indicate use behind the meter.
Capabilities
A shortest listed configuration of 2 h points to peak shaving, reducing the peak load at the connection point, and capacity value, standing in as firm capacity when demand peaks. The AC block in JinkoSolar SunGiga All in One JKS-215KLAA-100PLAA includes the inverter, which points to renewable colocation, sitting next to a wind or solar plant and sharing its grid connection.
Nominal energy
0.22MWh
Rated AC power
0.1MW
Duration
2hour
C / P rate
0.5P
What does this system typically cost?
BESSBASE.com user price estimates for SunGiga All in One JKS-215KLAA-100PLAA by JinkoSolar and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for SunGiga All in One JKS-215KLAA-100PLAA by JinkoSolar and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More JinkoSolar Systems
5| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| JinkoSolar | JKE-5015K-2H-LAADC Block · 20 ft container | 5MWh | — | 2–4h0.5–0.25C · flex | LFP314 Ah · Prismatic | |||
| JinkoSolar | JKE-3440K-2H-LAADC Block · 20 ft container | 3.44MWh | — | 2h0.5C | LFP280 Ah · Prismatic | |||
| JinkoSolar | SunGiga 344 (JKE344K100LDLA)DC Block · cabinet | 0.34MWh | 0.1MWAC | —0.5C | LFP280 Ah · Prismatic | |||
| JinkoSolar | SunGiga JKS-261KLAA-135PLAAAC Block · cabinet | 0.26MWh | 0.14MWAC | —0.5C | LFP314 Ah · Prismatic | |||
| JinkoSolar | SunGiga All in One JKS-215KLAA-100PLAAAC Block · cabinet | 0.22MWh | 0.1MWAC | 2h0.5C | LFP280 Ah · Prismatic |
About the Vendor
JinkoSolar, founded in 2006 and based in Shanghai, grew from a vertically integrated PV maker into an energy storage supplier for residential, commercial and industrial, and utility-scale markets. It launched its ESS line in 2021 with LFP systems, shipped about 3.3 GWh through the first three quarters of 2025, expected about 6 GWh for the full year, and reached about 4 GWh of storage manufacturing capacity in early 2024.
How to Read the Product Page
This profile of SunGiga All in One JKS-215KLAA-100PLAA by JinkoSolar is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.