BYD Energy Storage XN2C-B7284-E/U-R4 is a containerized LFP battery energy storage system supplied as a DC block. It provides 7.284 MWh nominal energy and 1.821 MW rated DC power. The unit uses liquid cooling and weighs 55.5 tonnes (122,356 lb).
Use Cases
BYD Energy Storage XN2C-B7284-E/U-R4 belongs to the utility-scale class by energy capacity. That specification points to use in front of the meter on the utility's side of the connection.
Capabilities
The specifications indicate for energy shifting, charging at one time and discharging hours later, and suggest capacity value, counting as firm supply toward a network's peak needs: BYD Energy Storage XN2C-B7284-E/U-R4 holds about 4 h of storage at full power, calculated from 7.284 MWh and 1.821 MW. Its DC block connects through a separate inverter. That configuration makes BYD Energy Storage XN2C-B7284-E/U-R4 a candidate for renewable colocation, sitting next to a wind or solar plant and sharing its grid connection.
Nominal energy
7.28MWh
Rated DC power
1.82MW
What does this system typically cost?
BESSBASE.com user price estimates for XN2C-B7284-E/U-R4 by BYD Energy Storage and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for XN2C-B7284-E/U-R4 by BYD Energy Storage and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
More BYD Energy Storage Systems
11| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| BYD Energy Storage | XN4C-B14568-E/U-R8DC Block | 14.6MWh | 1.82MWDC | — | LFP | |||
| BYD Energy Storage | XN4C-B14568-E/U-R4DC Block | 14.6MWh | 3.64MWDC | — | LFP | |||
| BYD Energy Storage | XN2C-B7284-E/U-R4DC Block | 7.28MWh | 1.82MWDC | — | LFP | |||
| BYD Energy Storage | MC12C-B6437-E/U-R4DC Block | 6.43MWh | 1.61MWDC | — | LFP | |||
| BYD Energy Storage | MC12C-B6012-E/U-R2DC Block | 6.01MWh | 3.01MWDC | — | LFP | |||
| BYD Energy Storage | MC10C-B5365-E/U-R4DC Block | 5.36MWh | 1.34MWDC | — | LFP | |||
| BYD Energy Storage | MC10C-B5010-E/U-R2DC Block | 5.01MWh | 2.51MWDC | — | LFP | |||
| BYD Energy Storage | MC-P200B932-E/U-R4M01AC Block · cabinet | 0.93MWh | 0.2MWAC | — | LFP350 Ah · Prismatic | |||
| BYD Energy Storage | MC-B536-E/U-R4DC Block · cabinet | 0.54MWh | 0.13MWDC | — | LFP | |||
| BYD Energy Storage | MC-B501-E/U-R2DC Block · cabinet | 0.5MWh | 0.25MWDC | — | LFP | |||
| BYD Energy Storage | MC-P200B466-E/U-R2M01AC Block · cabinet | 0.47MWh | 0.2MWAC | — | LFP350 Ah · Prismatic |
About the Vendor
BYD Energy Storage, founded in 2008 and based in Shenzhen, China, makes battery energy storage systems for grid and renewable energy use. By 2025, it had shipped 60 GWh of systems worldwide, held 13% of the global BESS market, and built a track record in utility-scale projects across several international markets.
How to Read the Product Page
This profile of XN2C-B7284-E/U-R4 by BYD Energy Storage is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.