Annual production capacity
0.2-1 GWh/yr
Bankability influence
Overall Positive
How the supplier's financials affect its products' bankability
Company Size
Large
1000-10000 headcount
Vertical integration
Medium
In-house production of key components
Company Overview
Founded in 2006 in California, Enphase is based in Fremont and has shipped about 2.50 GWh of energy-storage systems. It grew from a solar microinverter company into a residential BESS maker for distributed-energy projects.
Headquarters
Fremont, United States
Legal entity
Enphase Energy, Inc.
IPP / offtaker customers
Green Mountain Power
Integration footprint
United States
Adjacent product lines
residential storage, EV charging, microgrids, solar PV, cloud or digital services, O&M / services, portable energy, thermostats, manufacturing
Major presence in Europe; Moderate presence in North America and East Asia; Minor presence in Latin America, Middle East & North Africa, South Asia, and Oceania; no recorded presence in Central Asia & CIS, Sub-Saharan Africa, and Southeast Asia.
Cell & System Architecture
Cell chemistry
Cell format
Enphase’s IQ Battery BMS tracks each cell’s voltage, current, temperature, and state of charge, sets allowed charge and discharge currents, warns when limits or state of health near set points, balances cells, and can stop power transfer to protect against overvoltage, undervoltage, overcurrent, and overtemperature or undertemperature conditions.
Recent Developments
Enphase launched its first commercial battery system, the 80 kWh IQ Battery C80. The company opened US preorders for the integrated AC-coupled system for commercial and industrial use, with shipments set to start in the first half of 2027.
Market Price Estimate
No modelled range is published for this product yet.
Financial Health
Derived from the five sub-metrics below: 2 suboptimal · 3 healthy.
Corporate & Listing
Reference Project
Management Systems (ISO)
The BESS vendor possesses the ISO certificates Quality Management (ISO 9001), Environmental Management (ISO 14001) and Information Security (ISO 27001).
ESG & Sustainability
Enphase reports MSCI AA, ISS ESG Prime, and Sustainalytics low-risk ratings. It targets a 30% cut in market-based Scope 1 and 2 emissions intensity by 2030 from a 2021 baseline, uses 100% recyclable packaging, recycles 100% of hazardous, e-waste, and universal waste, screens suppliers for ESG risks, tracks corrective actions, and says it does not now verify supply chains or audit suppliers for human trafficking, though it may ask suppliers to cooperate in annual audits.
The rest of this vendor profile is for members
Create a BESSBASE.com account to open and compare full vendor details. No subscription fee. Access is immediate.
Compare to Other Vendors
All vendors| Vendor | Tier | HQ | Capacity | Compare |
|---|---|---|---|---|
| Tier-1 | Fremont, United States | 0.2-1 GWh | This vendor | |
| Tier-1 | Richardson, United States | 2-20 GWh | ||
| Tier-1 | Arlington, United States | 2-20 GWh | ||
| Tier-1 | Fremont, United States | 2-20 GWh | ||
| Tier-1 | Austin, United States | 20+ GWh |
How to Read the Enphase Vendor Page
This profile of Enphase is assembled exclusively from public data to support early-stage screening. Main source: enphase.com
BESSBASE analyzes the published financials of Enphase on a quarterly basis to produce the Financial Health Scorecard. The scorecard for Enphase is Overall Positive, based on the cumulative score of five components: Balance-sheet strength Suboptimal, Profitability Healthy, Leverage Suboptimal, Liquidity Healthy, and Cash-flow risk Healthy. The BESSBASE Research Team estimates all five components from the latest public financial statements of Enphase, assessed relative to peers and corporate structure.
The Overall Positive score indicates that the BESSBASE Research Team concludes, based on the last-quarter financials, that the manufacturer is likely to continue fulfilling its financial obligations for the typical duration of the procurement, shipment, and contractual period of a newly contracted BESS project. The Financial Health Scorecard is not a direct proxy for the bankability rating for Enphase energy storage products. It may form one input among others in a bankability assessment, or it may not, depending on the lender, project structure, and other factors.
The BESSBASE Tier-1 badge is assigned based on performance assessment of successfully financed and energized Enphase BESS projects worldwide.
The BESSBASE Vertical Integration scorecard for Enphase is Medium. It reflects the assessment of the supplier's production capabilities of the key Technology & Supply Chain components: PCS, Energy Management Software, Battery Management Software, and Battery Cell.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.