Hoenergy D-Cube-F135/261 is an LFP battery energy storage system for commercial and industrial use with 261 kWh nominal energy, supplied as an AC block. It uses liquid cooling and 314 Ah prismatic cells. The unit weighs 2.5 tonnes (5,512 lb).
Use Cases
Hoenergy D-Cube-F135/261 has energy capacity within the commercial and industrial range. It connects at 380 V, a low-voltage AC connection, and these specifications indicate use behind the meter.
Capabilities
Hoenergy D-Cube-F135/261 holds about 1.93 h of storage at full power, calculated from 261 kWh and 135 kW, and that configuration points to peak shaving, discharging into the hours of highest demand. The specifications suggest renewable colocation, sitting next to a wind or solar plant and sharing its grid connection, and its AC block includes the inverter.
Nominal energy
0.26MWh
Rated AC power
0.14MW
What does this system typically cost?
BESSBASE.com user price estimates for D-Cube-F135/261 by Hoenergy and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for D-Cube-F135/261 by Hoenergy and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More Hoenergy Systems
8| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| Hoenergy | D-Ocean-5016DDC Block · 20 ft container | 5.02MWh | — | —0.5C | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-418DDC Block · cabinet | 0.42MWh | — | — | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-S125/261AC Block · cabinet | 0.26MWh | 0.13MWAC | —0.5C | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-H125/261AC Block · cabinet | 0.26MWh | 0.13MWAC | — | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-F135/261AC Block · cabinet | 0.26MWh | 0.14MWAC | — | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-F135/261AC Block · cabinet | 0.26MWh | 0.14MWAC | — | LFP314 Ah · Prismatic | |||
| Hoenergy | EFIS-A-W100/215-AIOAC Block · cabinet | 0.22MWh | 0.1MWAC | — | LFP280 Ah · Prismatic | |||
| Hoenergy | EFIS-D-W50/100-AIOAC Block · cabinet | 0.1MWh | 0.05MWAC | 2h0.5C | LFP280 Ah · Prismatic |
About the Vendor
Founded in 2021 and based in Shanghai, Hoenergy makes BESS for commercial, industrial, and grid uses, with in-house BMS, PCS, EMS, and system integration. Its projects include frequency regulation, advanced materials manufacturing, shipbuilding, electronic materials, the Czech Republic, and industrial bakery sites, with at least 71.3 MWh deployed, including a 100 MW/50.43 MWh frequency regulation system.
How to Read the Product Page
This profile of D-Cube-F135/261 by Hoenergy is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.