Hoenergy EFIS-A-W100/215-AIO is an LFP storage system for commercial and industrial use. It provides 215.04000000000002 kWh nominal energy, is supplied as an AC block, and delivers 102 kW rated DC power. It uses forced air with speed control and 280 Ah prismatic cells.
Use Cases
Use behind the meter is consistent with the specifications of Hoenergy EFIS-A-W100/215-AIO. It has energy capacity within the commercial and industrial range. It connects at 400 V and is certified to low-voltage grid connection rules (EN50549-1, CEI 0-21), which is consistent with use on the customer's side of the utility connection.
Capabilities
A calculated storage duration of about 2.15 h at full power from 215.04 kWh and 100 kW makes Hoenergy EFIS-A-W100/215-AIO a candidate for capacity value, standing in as firm capacity when demand peaks. Its AC block includes the inverter and points to renewable colocation, operating alongside a wind or solar plant on one site.
Nominal energy
0.22MWh
Rated AC power
0.1MW
Rated DC power
0.1MW
What does this system typically cost?
BESSBASE.com user price estimates for EFIS-A-W100/215-AIO by Hoenergy and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for EFIS-A-W100/215-AIO by Hoenergy and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More Hoenergy Systems
8| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| Hoenergy | D-Ocean-5016DDC Block · 20 ft container | 5.02MWh | — | —0.5C | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-418DDC Block · cabinet | 0.42MWh | — | — | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-S125/261AC Block · cabinet | 0.26MWh | 0.13MWAC | —0.5C | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-H125/261AC Block · cabinet | 0.26MWh | 0.13MWAC | — | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-F135/261AC Block · cabinet | 0.26MWh | 0.14MWAC | — | LFP314 Ah · Prismatic | |||
| Hoenergy | D-Cube-F135/261AC Block · cabinet | 0.26MWh | 0.14MWAC | — | LFP314 Ah · Prismatic | |||
| Hoenergy | EFIS-A-W100/215-AIOAC Block · cabinet | 0.22MWh | 0.1MWAC | — | LFP280 Ah · Prismatic | |||
| Hoenergy | EFIS-D-W50/100-AIOAC Block · cabinet | 0.1MWh | 0.05MWAC | 2h0.5C | LFP280 Ah · Prismatic |
About the Vendor
Founded in 2021 and based in Shanghai, Hoenergy makes BESS for commercial, industrial, and grid uses, with in-house BMS, PCS, EMS, and system integration. Its projects include frequency regulation, advanced materials manufacturing, shipbuilding, electronic materials, the Czech Republic, and industrial bakery sites, with at least 71.3 MWh deployed, including a 100 MW/50.43 MWh frequency regulation system.
How to Read the Product Page
This profile of EFIS-A-W100/215-AIO by Hoenergy is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.