HyperStrong HSL3G71-06400 is an LFP storage system with 6.4 MWh nominal energy and about a 4-hour duration. It is supplied as an AC block with liquid cooling and 93% AC round-trip efficiency. The unit uses 601 Ah prismatic cells and weighs 24 tonnes (52,911 lb).

Use Cases

HyperStrong HSL3G71-06400 has energy capacity within the utility-scale range and is certified to medium- or high-voltage grid connection rules (VDE4110, VDE4120). It ships as a block of 2 containers. These specifications indicate use in front of the meter.

Capabilities

Rated at 0.5P, the specifications indicate peak shaving, cutting the power drawn from the grid at peak times, and grid services, support for the operation of the electricity network. For HyperStrong HSL3G71-06400, the specifications suggest energy shifting, charging at one time and discharging hours later. Its shortest listed configuration is 4 h, which makes it a candidate for capacity value, counting as firm supply toward a network's peak needs. Its AC block includes the inverter and points to renewable colocation, operating alongside a wind or solar plant on one site.

Nominal energy

6.4MWh

Rated AC power

1.6MW

Duration

4hour

C / P rate

0.5P

Round-trip efficiency (AC)

93 %AC

What does this system typically cost?

BESSBASE.com user price estimates for HSL3G71-06400 by HyperStrong and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.

Sign up to see and submit price estimates.

BESSBASE.com users can privately compare and submit prices for HSL3G71-06400 by HyperStrong and similar systems across 20+ international markets.

Energy & Power

Nominal energy
6.4MWh
Rated AC power
1.6MW
Duration
4 hour
C / P rate
0.5 P
Round-trip efficiency (AC)
93 %

Architecture

Container count
2
Installation
Outdoor-capable

DC Side

Nominal DC voltage
1,331.2 V
DC voltage range
1,123.2 – 1,497.6 V

AC Side

AC voltage
690 V
AC voltage parameters
3 Phase
Rated AC current
335 A
Grid frequency
50 Hz / 60 Hz

Physical & Footprint

Dimensions (W × D × H)
6,058 × 2,438 × 2,896mm
Weight
24t

Battery Cells

Chemistry
LFP
Cell capacity
601 Ah
Cell format
Prismatic Next-Gen 500+ Ah
Cell supplier
CATL

Lifespan

Cycle life
10,000 cycles>
Cycle-life conditions
70% SOH, 0.5P
Design life
20 years

Protection

Enclosure protection
IP55IP65
Fire & safety
Combustible gas detection, temperature sensor, smoke detection, cabin level aerosols, deflagration venting panels, water fire protection

Full Specification Sheet

Members

The rest of this spec sheet is for members

3 more specification blocks on this product. Create a free account to see every field on every product.

You stay on this page — it fills in as soon as you are signed in.

Plant Round-Trip Efficiency

Duration
duration 4 h
0.25C
—
State of health
new system
as-new
—
AC block (battery + PCS)
rte_ac 93 % @4 h
round trip @ 4 h
93 %
PCS (DC/AC)
Not Applicable for AC Block ESS
each way
—
—
Transformer LV/MV
typical default
each way
98.01 %
Transformer MV/HV
typical default
each way
98.01 %
Cables (all segments)
typical default
each way
98.8 %
Auxiliary power (plant's own consumption)
typical default
−4.4 pts
Plant Round-Trip Efficiency at the Point of Interconnection
83.9 %
40 %100 %
1.193MWh charged for every 1 MWh discharged
Both measured at the grid connection point. The plant's own power use is already included in the losses.

The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.

Site Space Required

single unit clearance 3 m / side
101.7m² total site area · 1 × 1
1,095 ft²0.0102 ha0.025 acres15.9 m² / MWh171 ft² / MWh
Unit W × D
6.06 × 2.44 m
19.88 × 8 ft
Site envelope
12.06 × 8.44 m
39.56 × 27.68 ft
Per unit
101.7 m²
Installed energy
6.4 MWh
1 × nameplate
Units1
Per row1
Clearance between unitsShared

Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.

Clearance allowance
6m per axis · 3 m per side
19.69 ft per axis · 9.84 ft per side

Single unit — matches the stored area_sqm convention.

More HyperStrong Systems

7
CompareLogoVendorSystemEnergyPowerDurationBattery CellOpen
HyperStrong
HSL3G71-12800AC Block · 10 ft container
12.8MWh3.2MWAC4h0.5CLFP601 Ah · Prismatic Next-Gen 500+ Ah
HyperStrong
HSL3901-12502DC Block · 20 ft container
12.5MWh—2hLFP587 Ah · Prismatic Next-Gen 500+ Ah
HyperStrong
HSL3G71-06400AC Block · 10 ft container
6.4MWh1.6MWAC4h0.5CLFP601 Ah · Prismatic Next-Gen 500+ Ah
HyperStrong
HSL3901-06251DC Block · 20 ft container
6.25MWh—2hLFP587 Ah · Prismatic Next-Gen 500+ Ah
HyperStrong
HSL3C7211-05015AC Block · 20 ft container
5.02MWh2.58MWAC—LFP314 Ah · Prismatic
HyperStrong
HSR01130-CNAC Block · cabinet
0.13MWh0.15MWAC8.36hLFP280 Ah · Prismatic
HyperStrong
HSRD1130-CNAC Block · cabinet
0.13MWh0.02MWDC8.36hLFP280 Ah · Prismatic

About the Vendor

HyperStrongTier-1Listed Company

Founded in 2011 and based in Beijing, HyperStrong makes and integrates BESS for utility-scale, commercial, and industrial use. It has deployed 60 GWh across more than 400 energy storage projects, backed by 15 years of R&D and project work, five manufacturing bases, three R&D centers, two testing labs, and offices in North America, EMEA, and Asia-Pacific.

Production scale20+ GWh
Company sizeLarge (1000-10000)
Vertical integrationMedium
BankabilityOverall Positive

How to Read the Product Page

This profile of HSL3G71-06400 by HyperStrong is assembled exclusively from public data to support early-stage screening and requires additional due diligence.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

BESSBASE.COM

Your trusted database of battery energy storage systems

© 2026 BESSBASE.com. All rights reserved.