HyperStrong HSRD1130-CN is an LFP storage system for commercial and industrial use with 125.44 kWh nominal energy. Supplied as an AC block, it offers about an 8.36-hour duration. Air cooling supports 15 kW rated DC power and 280 Ah prismatic cells.
Use Cases
Use behind the meter is consistent with the specifications of HyperStrong HSRD1130-CN. It has energy capacity within the commercial and industrial range and connects at 380 V. It is rated for indoor installation only, and its enclosure is rated IP20.
Capabilities
The shortest listed configuration at 8.36 h makes HyperStrong HSRD1130-CN a candidate for capacity value, counting as firm supply toward a network's peak needs. Its AC block includes the inverter and points to renewable colocation, operating alongside a wind or solar plant on one site.
Nominal energy
0.13 MWh
Rated DC power
0.02 MW
Duration
8.36 hour
What does this system typically cost?
BESSBASE.com user price estimates for HSRD1130-CN by HyperStrong and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for HSRD1130-CN by HyperStrong and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More HyperStrong Systems
7| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| HyperStrong | HSL3G71-12800 AC Block · 10 ft container | 12.8 MWh | 3.2 MW AC | 4 h 0.5C | LFP 601 Ah · Prismatic Next-Gen 500+ Ah | |||
| HyperStrong | HSL3901-12502 DC Block · 20 ft container | 12.5 MWh | — | 2 h | LFP 587 Ah · Prismatic Next-Gen 500+ Ah | |||
| HyperStrong | HSL3G71-06400 AC Block · 10 ft container | 6.4 MWh | 1.6 MW AC | 4 h 0.5C | LFP 601 Ah · Prismatic Next-Gen 500+ Ah | |||
| HyperStrong | HSL3901-06251 DC Block · 20 ft container | 6.25 MWh | — | 2 h | LFP 587 Ah · Prismatic Next-Gen 500+ Ah | |||
| HyperStrong | HSL3C7211-05015 AC Block · 20 ft container | 5.02 MWh | 2.58 MW AC | — | LFP 314 Ah · Prismatic | |||
| HyperStrong | HSR01130-CN AC Block · cabinet | 0.13 MWh | 0.15 MW AC | 8.36 h | LFP 280 Ah · Prismatic | |||
| HyperStrong | HSRD1130-CN AC Block · cabinet | 0.13 MWh | 0.02 MW DC | 8.36 h | LFP 280 Ah · Prismatic |
About the Vendor
Founded in 2011 and based in Beijing, HyperStrong makes and integrates BESS for utility-scale, commercial, and industrial use. It has deployed 60 GWh across more than 400 energy storage projects, backed by 15 years of R&D and project work, five manufacturing bases, three R&D centers, two testing labs, and offices in North America, EMEA, and Asia-Pacific.
How to Read the Product Page
This profile of HSRD1130-CN by HyperStrong is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.