FENECON INDUSTRIAL S is a containerized NMC battery energy storage system for commercial and industrial use, with 164 kWh nominal energy. It is supplied as an AC block, including the power conversion system, and weighs 2.4 tonnes (5,291 lb).
Use Cases
The specifications of FENECON INDUSTRIAL S together point to use behind the meter, at a customer's own premises. By energy capacity, it belongs to the commercial and industrial class. It connects at 400 V, a low-voltage AC connection.
Capabilities
For FENECON INDUSTRIAL S, the specifications suggest peak shaving, reducing the peak load at the connection point. It holds about 1.78 h of storage at full power, calculated from 164 kWh and 92 kW. Its AC block includes the inverter, which points to renewable colocation, operating alongside a wind or solar plant on one site.
Nominal energy
0.16 MWh
Rated AC power
0.09 MW
What does this system typically cost?
BESSBASE.com user price estimates for INDUSTRIAL S by FENECON and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for INDUSTRIAL S by FENECON and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More FENECON Systems
10| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| FENECON | INDUSTRIAL XL AC Block | 4.07 MWh | 1.5 MW AC | — | NMC | |||
| FENECON | INDUSTRIAL L AC Block | 1.29 MWh | 0.74 MW AC | — | NMC | |||
| FENECON | COMMERCIAL 92 (5 inverters, 5 towers) AC Block · cabinet | 1.05 MWh | 0.46 MW AC | 2.28 h 0.2C | LFP | |||
| FENECON | INDUSTRIAL M AC Block | 0.66 MWh | 0.7 MW AC | — | NMC | |||
| FENECON | COMMERCIAL 92 (1 inverter, 5 towers) AC Block · cabinet | 0.21 MWh | 0.09 MW AC | 2.28 h 0.2C | LFP | |||
| FENECON | COMMERCIAL 92 (1 inverter, 4 towers) AC Block · cabinet | 0.17 MWh | 0.09 MW AC | 1.83 h 0.2C · flex | LFP | |||
| FENECON | INDUSTRIAL S AC Block | 0.16 MWh | 0.09 MW AC | — | NMC | |||
| FENECON | COMMERCIAL 92 AC Block · cabinet | 0.08 MWh | 0.09 MW AC | — | LFP | |||
| FENECON | COMMERCIAL 50 AC Block · cabinet | 0.05 MWh | 0.05 MW AC | — | LFP | |||
| FENECON | Battery tower (nominal capacity 43.01 kWh) AC Block · cabinet | 0.04 MWh | 0.09 MW AC | 1.37 h 0.2C | LFP |
About the Vendor
FENECON, founded in 2011 in Iggensbach, Lower Bavaria, is a German maker of battery storage systems based in Deggendorf, Germany. The company runs its production site in Iggensbach and has expanded to Vilshofen/Albersdorf and Deggendorf, and in 2021 it founded FERESTO GmbH to extend its battery storage work.
How to Read the Product Page
This profile of INDUSTRIAL S by FENECON is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.