FENECON INDUSTRIAL XL is a containerized NMC battery energy storage system for utility-scale projects with 4.072 MWh nominal energy. It is supplied as an AC block with 1.5 MW rated DC power. The system uses water-glycol or HVAC cooling, delivers 95% DC round-trip efficiency, and weighs 32 tonnes (70,548 lb).
Use Cases
FENECON INDUSTRIAL XL belongs to the utility-scale class by energy capacity. That specification points to use in front of the meter, on the utility's side of the connection.
Capabilities
Its AC block includes the inverter, which points to renewable colocation, operating alongside a wind or solar plant on one site. FENECON INDUSTRIAL XL holds about 2.71 h of storage at full power, calculated from 4.072 MWh and 1.5 MW, and the specifications suggest capacity value, standing in as firm capacity when demand peaks.
Nominal energy
4.07 MWh
Rated AC power
1.5 MW
Rated DC power
1.5 MW
Round-trip efficiency (AC)
95 % DC
What does this system typically cost?
BESSBASE.com user price estimates for INDUSTRIAL XL by FENECON and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for INDUSTRIAL XL by FENECON and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More FENECON Systems
10| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| FENECON | INDUSTRIAL XL AC Block | 4.07 MWh | 1.5 MW AC | — | NMC | |||
| FENECON | INDUSTRIAL L AC Block | 1.29 MWh | 0.74 MW AC | — | NMC | |||
| FENECON | COMMERCIAL 92 (5 inverters, 5 towers) AC Block · cabinet | 1.05 MWh | 0.46 MW AC | 2.28 h 0.2C | LFP | |||
| FENECON | INDUSTRIAL M AC Block | 0.66 MWh | 0.7 MW AC | — | NMC | |||
| FENECON | COMMERCIAL 92 (1 inverter, 5 towers) AC Block · cabinet | 0.21 MWh | 0.09 MW AC | 2.28 h 0.2C | LFP | |||
| FENECON | COMMERCIAL 92 (1 inverter, 4 towers) AC Block · cabinet | 0.17 MWh | 0.09 MW AC | 1.83 h 0.2C · flex | LFP | |||
| FENECON | INDUSTRIAL S AC Block | 0.16 MWh | 0.09 MW AC | — | NMC | |||
| FENECON | COMMERCIAL 92 AC Block · cabinet | 0.08 MWh | 0.09 MW AC | — | LFP | |||
| FENECON | COMMERCIAL 50 AC Block · cabinet | 0.05 MWh | 0.05 MW AC | — | LFP | |||
| FENECON | Battery tower (nominal capacity 43.01 kWh) AC Block · cabinet | 0.04 MWh | 0.09 MW AC | 1.37 h 0.2C | LFP |
About the Vendor
FENECON, founded in 2011 in Iggensbach, Lower Bavaria, is a German maker of battery storage systems based in Deggendorf, Germany. The company runs its production site in Iggensbach and has expanded to Vilshofen/Albersdorf and Deggendorf, and in 2021 it founded FERESTO GmbH to extend its battery storage work.
How to Read the Product Page
This profile of INDUSTRIAL XL by FENECON is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.