699 kWh nominal energy, RCT Power POWER CESS 700 AC is a containerized LFP battery energy storage system for commercial and industrial use, supplied as an AC block. Liquid cooling supports 98.6% AC round-trip efficiency. It operates across a 715 to 928 V DC window and weighs 9.7 tonnes (21,385 lb).
Use Cases
The specifications of RCT Power POWER CESS 700 AC suggest use behind the meter inside a customer's own electrical installation. Its energy capacity is within the commercial and industrial range, and it connects at 230 V, a low-voltage AC connection.
Capabilities
For RCT Power POWER CESS 700 AC, the specifications suggest peak shaving, discharging into the hours of highest demand. It holds about 1.86 h of storage at full power, calculated from 699 kWh and 375 kW. Its AC block includes the inverter, which makes RCT Power POWER CESS 700 AC a candidate for renewable colocation, operating alongside a wind or solar plant on one site.
Nominal energy
0.7 MWh
Rated AC power
0.38 MW
C / P rate
0.5 C
Round-trip efficiency (AC)
98.6 % AC
What does this system typically cost?
BESSBASE.com user price estimates for POWER CESS 700 AC by RCT Power and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.
Sign up to see and submit price estimates.
BESSBASE.com users can privately compare and submit prices for POWER CESS 700 AC by RCT Power and similar systems across 20+ international markets.
Energy & Power
Architecture
DC Side
AC Side
Physical & Footprint
Battery Cells
Lifespan
Protection
Full Specification Sheet
MembersThe rest of this spec sheet is for members
3 more specification blocks on this product. Create a free account to see every field on every product.
You stay on this page — it fills in as soon as you are signed in.
Plant Round-Trip Efficiency
The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.
Site Space Required
Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.
Single unit — matches the stored area_sqm convention.
More RCT Power Systems
8| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
| RCT Power | POWER CESS 4000 DC Block · 20 ft container | 4.07 MWh | — | 2–8 h 0.1–0.5C · flex | LFP 306 Ah · Prismatic | |||
| RCT Power | POWER CESS 900 AC AC Block | 0.93 MWh | 0.5 MW AC | — 0.5C | LFP | |||
| RCT Power | POWER CESS 700 AC AC Block | 0.7 MWh | 0.38 MW AC | — 0.5C | LFP | |||
| RCT Power | POWER CESS 450 AC AC Block | 0.47 MWh | 0.25 MW AC | — 0.5C | LFP | |||
| RCT Power | POWER CESS 200 DC STS AC Block · cabinet | 0.23 MWh | 0.1 MW AC | — 0.5C | LFP | |||
| RCT Power | POWER CESS 200 DC AC Block · cabinet | 0.23 MWh | 0.1 MW AC | — 0.5C | LFP | |||
| RCT Power | POWER CESS 200 AC STS AC Block · cabinet | 0.23 MWh | 0.1 MW AC | — 0.5C | LFP | |||
| RCT Power | POWER CESS 200 AC AC Block · cabinet | 0.23 MWh | 0.1 MW AC | — 0.5C | LFP |
About the Vendor
RCT Power, founded in 2012 and based in Konstanz, Germany, makes battery storage systems. By August 2024, it had delivered more than 10 GWh of storage capacity, including 50 large systems to the United States, and it said it could make 25 GWh, with plans to expand to 40 GWh by the end of 2025.
How to Read the Product Page
This profile of POWER CESS 700 AC by RCT Power is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.