Supplied as an AC block, TeraStor Energy S300 is an LFP battery energy storage system for commercial and industrial applications with 261 kWh nominal energy. It uses liquid cooling and weighs 2.7 tonnes (5,952 lb). Its DC voltage window spans 689 to 930.8 V.

Use Cases

TeraStor Energy S300 belongs to the commercial and industrial class by energy capacity. It connects at 400 V, a low-voltage AC connection. These specifications indicate use behind the meter.

Capabilities

Its AC block includes the inverter, which points to renewable colocation, storing output from a wind or solar plant on the same site. TeraStor Energy S300 holds about 2.09 h of storage at full power, calculated from 261 kWh and 125 kW, and the specifications suggest capacity value, standing in as firm capacity when demand peaks.

Nominal energy

0.26 MWh

Rated AC power

0.13 MW

What does this system typically cost?

BESSBASE.com user price estimates for S300 by TeraStor Energy and similar storage systems. The ranges are LDP (Landed Duty Paid) prices per kWh that cover all expenses of delivering the goods to the buyer's premises, including production, shipping, sales margins, and import duties.

Sign up to see and submit price estimates.

BESSBASE.com users can privately compare and submit prices for S300 by TeraStor Energy and similar systems across 20+ international markets.

Energy & Power

Nominal energy
0.26 MWh
Rated AC power
0.13 MW

Architecture

Installation
Outdoor-capable

DC Side

DC voltage range
689 – 930.8 V

AC Side

AC voltage
400 V

Physical & Footprint

Dimensions (W × D × H)
1,128 × 1,384 × 2,329 mm
Weight
2.7 t

Battery Cells

Chemistry
LFP
Cell supplier
EVE Energy

Lifespan

Protection

Ingress protection (IP)
IP54

Full Specification Sheet

Members

The rest of this spec sheet is for members

3 more specification blocks on this product. Create a free account to see every field on every product.

You stay on this page — it fills in as soon as you are signed in.

Plant Round-Trip Efficiency

Duration
energy ÷ power 2 h
0.5C
—
State of health
new system
as-new
—
DC block
typical @2 h
round trip @ 2 h
94 %
PCS (DC/AC)
typical default
each way
97.02 %
Transformer LV/MV
typical default
each way
98.01 %
Transformer MV/HV
typical default
each way
98.01 %
Cables (all segments)
typical default
each way
98.8 %
Auxiliary power (plant's own consumption)
typical default
−4.3 pts
Plant Round-Trip Efficiency at the Point of Interconnection
82.2 %
40 % 100 %
1.216 MWh charged for every 1 MWh discharged
Both measured at the grid connection point. The plant's own power use is already included in the losses.

The calculator estimates the full "plant" round-trip efficiency (RTE) at the point of interconnection. Some values are pre-blocked depending on information on a particular ESS. The rows that are marked "each way" are one-way efficiencies; they are applied on charge and again on discharge. We then square them. To enter a bundled PCS efficiency value, use its rated-power value, not peak. If the PCS skid already includes the LV/MV transformer, set Transformer LV/MV to 100 % so those losses are not counted twice.

Site Space Required

single unit clearance 3 m / side
52.6m² total site area · 1 × 1
567 ft²0.0053 ha0.013 acres202.4 m² / MWh2,179 ft² / MWh
Unit W × D
1.13 × 1.38 m
3.7 × 4.54 ft
Site envelope
7.13 × 7.38 m
23.39 × 24.23 ft
Per unit
52.6 m²
Installed energy
0.26 MWh
1 × nameplate
Units1
Per row1
Clearance between unitsShared

Shared: one 3 m aisle serves both neighbours. Dedicated: each unit keeps its own 3 m, so gaps double to 6 m.

Clearance allowance
6m per axis · 3 m per side
19.69 ft per axis · 9.84 ft per side

Single unit — matches the stored area_sqm convention.

More TeraStor Energy Systems

5
CompareLogoVendorSystemEnergyPowerDurationBattery CellOpen
TeraStor Energy
P8000 DC Block
8.2 MWh3.6 MW DC— LFP
TeraStor Energy
S4000 DC Block
4.07 MWh2 MW DC— LFP
TeraStor Energy
S1000 AC Block
1.04 MWh0.5 MW AC— LFP
TeraStor Energy
S800 AC Block
0.78 MWh0.38 MW AC— LFP
TeraStor Energy
S300 AC Block · cabinet
0.26 MWh0.13 MW AC— LFP

About the Vendor

TeraStor Energy Tier-2 Listed Company

TeraStor Energy became an independent company in 2023 and is based in Marlborough, Massachusetts. Its team has deployed grid-scale battery systems since 2007 across three continents and five system generations, and it designs and builds BESS units up to 8.2 MWh for utility grids, AI data centers, and mission-critical infrastructure.

Production scale 2-20 GWh
Company size Small (1-300)
Vertical integration Minimal
Bankability Neutral

How to Read the Product Page

This profile of S300 by TeraStor Energy is assembled exclusively from public data to support early-stage screening and requires additional due diligence.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

Report an error

BESSBASE

BESSBASE is a screening intelligence platform used by asset owners, developers, and banks to assess industrial and grid-scale battery storage solutions.

  • X
  • LinkedIn

© 2026 BESSBASE.com by BESSBASE LLC. All rights reserved.