Annual production capacity
0.2-1 GWh/yr
Bankability influence
Neutral
How the supplier's financials affect its products' bankability
Company Size
Large
1000-10000 headcount
Vertical integration
Minimal
In-house production of key components
Company Overview
Founded in 2012, AlphaESS is based in Nantong, Jiangsu, and makes battery energy storage systems for residential, commercial, industrial, and utility use. Its profile says more than 300,000 systems operate in 130-plus countries, with 1 GWh of commercial capacity in operation, and in 2024 it reported 3 GWh of annual production capacity, including deliveries of 320 MWh to the Czech Republic and an initial 160 MWh to the Kubuqi Desert.
Headquarters
Nantong, China
Legal entity
AlphaESS Co., Ltd.
IPP / offtaker customers
Green Genius
Integration footprint
China, Malaysia
Adjacent product lines
Balcony Solar System, SMILE-EVC11 / SMILE-G3-EVC11 EV Charger, VitaPower VT1000
Major presence in Europe; Moderate presence in East Asia and Oceania; Minor presence in North America; no recorded presence in Latin America, Central Asia & CIS, Middle East & North Africa, Sub-Saharan Africa, South Asia, and Southeast Asia.
Cell & System Architecture
Cell chemistry
Cell format
Named chemistries
Block architecture
Application segments
AlphaESS’s BMS tracks each cell’s temperature, voltage, state of charge, and state of health to support battery safety and performance. Its cloud monitoring shows real-time and past battery data in its mobile app.
Recent Developments
AlphaESS shipped the first 90 MWh of a planned 320 MWh BESS for the Czech Republic’s largest stand-alone battery storage project at sites in Chvaletice and Kladno.
Market Price Estimate
Financial Health
Derived from the five sub-metrics below: all five neutral.
Reference Project
Management Systems (ISO)
The BESS vendor possesses the ISO certificates Quality Management (ISO 9001), Environmental Management (ISO 14001), Occupational Safety (ISO 45001) and Information Security (ISO 27001).
Product & Safety Standards
ESG & Sustainability
AlphaESS expanded supplier management and extended sustainability criteria to partners, with 2,477 suppliers registered; EUPD Research gave its ESG reporting the ESG Transparency Award for the second year in a row.
The rest of this vendor profile is for members
Create a BESSBASE.com account to open and compare full vendor details. No subscription fee. Access is immediate.
AlphaESS Storage Products
23| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
Commercial & industrial BESS 9 | ||||||||
| AlphaESS | STORION-LC 836 DC Block · cabinet | 0.84 MWh | 0.42 MW DC | — 0.5C | LFP | |||
| AlphaESS | STORION-LC-TB150 (Ultra) AC Block · cabinet | 0.31 MWh | 0.15 MW AC | — 0.5C | LFP 314 Ah · Prismatic | |||
| AlphaESS | STORION-LC-TB150 (Standard) AC Block · cabinet | 0.31 MWh | 0.15 MW AC | — 0.5C | LFP 314 Ah · Prismatic | |||
| AlphaESS | STORION-LC-TB125 AC Block · cabinet | 0.26 MWh | 0.13 MW AC | — 0.5C | LFP | |||
| AlphaESS | STORION-H50-G3 AC Block · cabinet | 0.12 MWh | 0.05 MW AC | — | LFP 314 Ah · Prismatic | |||
| AlphaESS | Stax - M30 AC Block · cabinet | 0.1 MWh | 0.03 MW AC | — | LFP | |||
| AlphaESS | Stax - M50 AC Block · cabinet | 0.1 MWh | 0.05 MW AC | — | LFP | |||
| AlphaESS | STORION-H30-G3 AC Block · cabinet | 0.07 MWh | 0.03 MW AC | — | LFP 314 Ah · Prismatic | |||
| AlphaESS | M166314-52S-EX DC Block · cabinet | 0.05 MWh | — | — | LFP | |||
Grid-Scale BESS 9 | ||||||||
| AlphaESS | Aster 6260-EX-H20-DC DC Block · 20 ft container | 6.26 MWh | 3.13 MW DC | — 0.5C | LFP | |||
| AlphaESS | Aster 5000 DC Block · 20 ft container | 5.02 MWh | 2.51 MW DC | 2 h 0.5C | LFP | |||
| AlphaESS | STORION-TB487.5 (Indoor) AC Block · cabinet | 1.61 MWh | 0.49 MW AC | — | LFP 105 Ah · Prismatic | |||
| AlphaESS | STORION-TB500 (Indoor) AC Block · cabinet | 1.61 MWh | 0.5 MW AC | — | LFP 105 Ah · Prismatic | |||
| AlphaESS | STORION-TB375 (Indoor) AC Block · cabinet | 1.61 MWh | 0.38 MW AC | — | LFP 105 Ah · Prismatic | |||
| AlphaESS | Aster TB500-EX01 AC Block · 20 ft container | 1.41 MWh | 0.5 MW AC | — 0.5C | LFP | |||
| AlphaESS | STORION-TB312.5 (Indoor) AC Block · cabinet | 1.37 MWh | 312.5 MW AC | — | LFP | |||
| AlphaESS | STORION-TB187.5 (Indoor) AC Block · cabinet | 1.37 MWh | 187.5 MW AC | — | LFP | |||
| AlphaESS | STORION-TB250 (Indoor) AC Block · cabinet | 1.37 MWh | 250 MW AC | — | LFP | |||
Compare to Other Vendors
All vendors| Vendor | Tier | HQ | Capacity | Compare |
|---|---|---|---|---|
| Tier-2 | Nantong, China | 0.2-1 GWh | This vendor | |
| Tier-2 | Shenzhen, China | 0.2-1 GWh | ||
| Tier-2 | Shenzhen, China | 2-20 GWh | ||
| Tier-2 | Suzhou, China | 0.2-1 GWh | ||
| Tier-2 | Jining, China | 0.2-1 GWh |
How to Read the AlphaESS Vendor Page
This profile of AlphaESS is assembled exclusively from public data to support early-stage screening. Main source: alphaess.com
BESSBASE analyzes the published financials of AlphaESS on a quarterly basis to produce the Financial Health Scorecard. The scorecard for AlphaESS is Neutral, because the BESSBASE Research Team does not have the estimates for non-public BESS manufacturers.
The Financial Health Scorecard is not a direct proxy for the bankability rating for AlphaESS energy storage products. It may form one input among others in a bankability assessment, or it may not, depending on the lender, project structure, and other factors.
Tier-2 is assigned when the BESSBASE Research Team cannot validate from public data that the energy storage products of AlphaESS robustly and repetitively obtain external financing from major financial institutions.
The BESSBASE Vertical Integration scorecard for AlphaESS is Minimal. It reflects the assessment of the supplier's production capabilities of the key Technology & Supply Chain components: PCS, Energy Management Software, Battery Management Software, and Battery Cell.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.