Annual production capacity
0.2-1GWh/yr
Bankability influence
Neutral
How the supplier's financials affect its products' bankability
Company Size
Small
1-300 headcount
Vertical integration
Minimal
In-house production of key components
Company Overview
Capture Energy, founded in 2023 and based in Gothenburg, Sweden, develops and delivers turnkey BESS for European energy storage and flexibility markets. It operates across the Nordics and has offices in Stockholm, Norway, Denmark, Finland, and Spain, and its systems start at 0.5 MW with liquid-cooled PowerBox units, the Capture Controller, and the Cloud platform.
Headquarters
Göteborg, Sweden
Legal entity
Capture Energy AB
IPP / offtaker customers
Å Entelios, Borås Energi & Miljö, E&B Renewables, Nuvve Denmark ApS
Integration footprint
Sweden
Adjacent product lines
flexibility services, service, cloud-based Operations and Maintenance platform, Capture Flex Trade
Major presence in North America, Europe, East Asia, and Southeast Asia; Moderate presence in Latin America, Middle East & North Africa, Sub-Saharan Africa, South Asia, and Oceania; no recorded presence in Central Asia & CIS.
Cell & System Architecture
Cell chemistry
Named chemistries
Block architecture
Application segments
Battery Management System
Capture Energy’s PowerBox uses a multilayer BMS with string and master layers to monitor battery health. It tracks state of charge, temperature, and other safety limits, and it disconnects loads when those values move outside defined limits.
Recent Developments
Capture Energy AB signed a framework agreement to deploy its BESS PowerBox LC systems across Europe. The deal starts with three projects and about $5 million in initial sales contracts.
Market Price Estimate
Financial Health
Derived from the five sub-metrics below: all five neutral.
Reference Project
Certifications
Management Systems (ISO)
Product & Safety Standards
ESG & Sustainability
Capture Energy says it complies with the EU Battery Regulation, including recycled-content targets, carbon-footprint declarations, and battery passports, and it follows Norway’s Transparency Act by checking its supply chain for human rights and working conditions.
The rest of this vendor profile is for members
Create a BESSBASE.com account to open and compare full vendor details. It is free and fast.
Capture Energy Storage Products
8| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
Industrial & Commercial ESS Solutions 2 | ||||||||
| Capture Energy | BESS PowerBox 0.5 MW/0.55 MWh, 400 VACAC Block · 20 ft container | 0.55MWh | 0.5MWAC | 1h1C | LFP90 Ah · Prismatic | |||
| Capture Energy | BESS PowerPack LC 125 kW/261 kWh, 400 VACAC Block · cabinet | 0.26MWh | 0.13MWAC | —0.5C | LFP314 Ah · Prismatic | |||
Grid-Scale BESS 6 | ||||||||
| Capture Energy | BESS PowerBox LC 1 MW/2.3 MWh, 400 VACAC Block · 20 ft container | 2.32MWh | 1MWAC | 2h0.5C | LFP314 Ah · Prismatic | |||
| Capture Energy | BESS PowerBox 1.2 MW/2 MWh, 690 VACAC Block · 20 ft container | 2.06MWh | 1.2MWAC | 2h0.6C | LFP280 Ah · Prismatic | |||
| Capture Energy | BESS PowerBox 1 MW/1.7 MWh, 690 VACAC Block · 20 ft container | 1.72MWh | 1MWAC | 2h0.6C | LFP280 Ah · Prismatic | |||
| Capture Energy | BESS PowerBox 0.8 MW/1.35 MWh, 690 VACAC Block · 20 ft container | 1.38MWh | 0.8MWAC | 2h0.6C | LFP280 Ah · Prismatic | |||
| Capture Energy | BESS PowerBox 1 MW/1.1 MWh, 400 VACAC Block · 20 ft container | 1.1MWh | 1MWAC | 1h1C | LFP90 Ah · Prismatic | |||
| Capture Energy | BESS PowerBox 0.6 MW/1 MWh, 690 VACAC Block · 20 ft container | 1.03MWh | 0.6MWAC | 2h0.6C | LFP280 Ah · Prismatic | |||
Compare to Other Vendors
All vendors| Vendor | Tier | HQ | Capacity | Compare |
|---|---|---|---|---|
| Tier-2 | Göteborg, Sweden | 0.2-1 GWh | This vendor | |
| Tier-2 | Shenzhen, China | 2-20 GWh | ||
| Tier-2 | Nürtingen, Germany | 2-20 GWh | ||
| Tier-2 | Dumbarton, United Kingdom | 0.2-1 GWh | ||
| Tier-2 | Almere Stad, Netherlands | 0.2-1 GWh |
How to Read the Vendor Page
This profile of Capture Energy is assembled exclusively from public data to support early-stage screening and requires additional due diligence.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.