Annual production capacity
20+ GWh/yr
Bankability influence
Overall Positive
How the supplier's financials affect its products' bankability
Company Size
Large
1000-10000 headcount
Vertical integration
Minimal
In-house production of key components
Company Overview
Founded in 2004 and based in Hong Kong, CIMC ENRIC makes energy storage equipment and integrated energy systems within the CIMC Group. It has delivered more than 60 GWh of storage equipment, including BESS and related systems for industrial and grid use.
Headquarters
Shijiazhuang, China
Legal entity
CIMC ENRIC Energy Systems
Integration footprint
China
Adjacent product lines
EV charging, gas infrastructure, gas-to-power, modular power generation, microgrids, O&M / services, solar PV, hydrogen
Moderate presence in East Asia; no recorded presence in North America, Latin America, Europe, Central Asia & CIS, Middle East & North Africa, Sub-Saharan Africa, South Asia, Southeast Asia, and Oceania.
Cell & System Architecture
Cell chemistry
CIMC ENRIC’s mobile BESS solutions use BMS-based monitoring and control to manage state of charge, safe charging, controlled recharge, alarms, metering, remote monitoring, and kWh-based settlement.
Management Systems (ISO)
The BESS vendor possesses the ISO certificates Quality Management (ISO 9001), Environmental Management (ISO 14001), Occupational Safety (ISO 45001) and Energy Management (ISO 50001).
ESG & Sustainability
CIMC ENRIC’s MSCI ESG rating rose from BBB to AA in 2023, and its Wind ESG rating rose from A to AA. The company says it recycles waste materials, uses lighter products to cut Scope 3 emissions, reviews ESG goals, and checks suppliers for environmental and social risks.
Market Price Estimate
No modelled range is published for this product yet.
Financial Health
Derived from the five sub-metrics below: all five healthy.
Corporate & Listing
Notable Shareholder
CIMC Enric Holdings Limited
Notable Shareholder of CIMC ENRIC is CIMC Enric Holdings Limited.
Reference Project
Recent Developments
CIMC ENRIC commissioned its Baotou, Inner Mongolia, energy storage base in September 2026. The new site expands its manufacturing network to five sites, with Phase I annual delivery capacity at 15 GWh and Phase II set for completion in 2027.
The rest of this vendor profile is for members
Create a BESSBASE.com account to open and compare full vendor details. No subscription fee. Access is immediate.
Compare to Other Vendors
All vendors| Vendor | Tier | HQ | Capacity | Compare |
|---|---|---|---|---|
| Tier-2 | Shijiazhuang, China | 20+ GWh | This vendor | |
| Tier-2 | Shenzhen, China | 0.2-1 GWh | ||
| Tier-2 | Shenzhen, China | 2-20 GWh | ||
| Tier-2 | Suzhou, China | 0.2-1 GWh | ||
| Tier-2 | Nantong, China | 0.2-1 GWh |
How to Read the CIMC ENRIC Vendor Page
This profile of CIMC ENRIC is assembled exclusively from public data to support early-stage screening.
BESSBASE analyzes the published financials of CIMC ENRIC on a quarterly basis to produce the Financial Health Scorecard. The scorecard for CIMC ENRIC is Overall Positive, based on the cumulative score of five components: Balance-sheet strength Healthy, Profitability Healthy, Leverage Healthy, Liquidity Healthy, and Cash-flow risk Healthy. The BESSBASE Research Team estimates all five components from the latest public financial statements of parent company CIMC Enric Holdings Limited of CIMC ENRIC.
The Overall Positive score indicates that the BESSBASE Research Team concludes, based on the last-quarter financials, that the manufacturer is likely to continue fulfilling its financial obligations for the typical duration of the procurement, shipment, and contractual period of a newly contracted BESS project. The Financial Health Scorecard is not a direct proxy for the bankability rating for CIMC ENRIC energy storage products. It may form one input among others in a bankability assessment, or it may not, depending on the lender, project structure, and other factors.
Tier-2 is assigned when the BESSBASE Research Team cannot validate from public data that the energy storage products of CIMC ENRIC robustly and repetitively obtain external financing from major financial institutions.
The BESSBASE Vertical Integration scorecard for CIMC ENRIC is Minimal. It reflects the assessment of the supplier's production capabilities of the key Technology & Supply Chain components: PCS, Energy Management Software, Battery Management Software, and Battery Cell.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.