Eaton

Eaton

eaton.com

Tier-1Listed Company

Updated

Aug 28, 2026

Compare

Annual production capacity

0.2-1

GWh/yr · vendor-reported

Bankability influence

Overall Positive

Company Size

Major

10000+ headcount

Vertical integration

Minimal

Company Overview

Founded in 1911 and based in Dublin, Ireland, Eaton entered the battery energy storage market in 2024 with its xStorage BESS for commercial, industrial, and utility-scale use. The system offers 250 to 1,000 kWh of usable energy, including containerized C20 units rated at about 1.1 MWh, and Eaton places storage within its Everything as a Grid strategy.

Headquarters

Dublin, Ireland

Legal entity

Eaton Corporation plc

IPP / offtaker customers

Endurant Energy, Town of Manchester

Integration footprint

Finland, United States

Production scale

0.2-1 GWh/yr

Adjacent product lines

residential storage, EV charging, microgrids, solar PV

Major Shipment Regions
North AmericaLatin AmericaEuropeCentral Asia & CISMiddle East & North AfricaSub-Saharan AfricaSouth AsiaEast AsiaSoutheast AsiaOceania
Major Minor
North America Major
Latin America Major
Europe Major
Middle East & North Africa Major
Sub-Saharan Africa Major
South Asia Major
East Asia Major
Southeast Asia Major
Oceania Major
Central Asia & CIS Minor

Major presence in North America, Latin America, Europe, Middle East & North Africa, Sub-Saharan Africa, South Asia, East Asia, Southeast Asia, and Oceania; Minor presence in Central Asia & CIS.

Financial Health

Bankability influenceOverall Positive

Derived from the five sub-metrics below — 2 moderate · 3 healthy.

Balance-sheet strengthModerate
ProfitabilityHealthy
LeverageHealthy
LiquidityModerate
Cash-flow riskHealthy

Reference Project

Project

Eaton and Endurant Energy 150 MWh BESS deployment across New York City ; multiple commercial and industrial building sites in the Bronx and Staten Island, New York City, New York, United States

Coordinates40.71273° N, 74.00602° W

Cell & System Architecture

Cell chemistry

Lithium-ion

Cell format

Prismatic

Named chemistries

LFP

Block architecture

AC Block

Application segments

Grid-ScaleIndustrial & Commercial

Battery Management System

Eaton’s BMS monitors each cell’s voltage, temperature, charge cycles, and health for cell balancing and planned maintenance. It reports battery state of health and state of charge through the UPS display and through management software.

Corporate & Listing

Company typeListed Company
Exchange listingETN
Company sizeMajor (10000+)

Recent Developments

Certifications

Management Systems (ISO)

ISO 9001ISO 14001ISO 45001

ESG & Sustainability

Eaton has science-based emissions targets under a net-zero framework, including a 50% cut in Scope 1 and 2 emissions by 2030 and net-zero greenhouse gas emissions by 2050, and an independent party verified its GHG data. It also reports zero-waste-to-landfill status at 86% of operating sites, higher recycled content in materials such as steel, and supply chain oversight for 98% of supplier spend through code-of-conduct affirmations, annual risk reviews, and site reviews of environmental, health, safety, and product stewardship practices.

Full vendor profile

Members

The rest of this vendor profile is for members

Create a BESSBASE.com account to open and compare full vendor details. It is free and fast.

EatonIndustrial & Commercial ESS Solutions

ProductEnergyPowerDurationC / P rateChemistryBlock
xStorage BESS0.75 MWh0.75 MW ACLFPAC Block
xStorage BESS0.5 MWh0.5 MW ACLFPAC Block
xStorage battery energy storage system (BESS)0.25 MWh0.25 MW ACLFPAC Block

EatonGrid-Scale BESS

ProductEnergyPowerDurationC / P rateChemistryBlock
xStorage BESS1 MWh1 MW ACLFPAC Block
xStorage BESS1 MWh1 MW ACLFPAC Block

Compare to Other Vendors

All vendors

This vendor

Eaton

Eaton

TierTier-1
HQDublin, Ireland
Capacity0.2-1 GWh
TierTier-1
HQShenzhen, China
Capacity20+ GWh
TierTier-1
HQRichardson, United States
Capacity2-20 GWh
TierTier-1
HQShenzhen, China
Capacity0.2-1 GWh
TierTier-1
HQZhuzhou, China
Capacity20+ GWh

How to Read This Page

This vendor profile is assembled exclusively from public data to support early-stage screening and requires additional due diligence.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

BESSBASE.COM

Your trusted database of battery energy storage systems

© 2026 BESSBASE.com. All rights reserved.