Great Power

Tier-2 Listed Company

greatpower.net Updated Oct 28, 2026

Tier-2 Listed Company Updated Oct 28, 2026
Compare

Annual production capacity

20+ GWh/yr

Bankability influence

Neutral

How the supplier's financials affect its products' bankability

Company Size

Major

10000+ headcount

Vertical integration

High

In-house production of key components

Company Overview

Founded in Guangzhou, China, in 2001 by Chairman Xia Xinde, Great Power has 25 years of battery manufacturing experience. It entered the energy storage market in 2011 and reports more than 300 GWh of battery production capacity and over 300,000 energy storage product sets installed worldwide.

Headquarters

Guangzhou, China

Legal entity

Guangzhou Great Power Energy and Technology Co., Ltd.

IPP / offtaker customers

ACWA Power, Northland Power

Integration footprint

China, Türkiye, Vietnam

Adjacent product lines

residential storage, UPS backup power, portable energy storage, EV batteries, consumer batteries, outdoor power supply, two-wheeled vehicle batteries, HEV hybrid systems, 12V/48V starting power supply, cloud or digital services, solar PV integration

Major Shipment Regions
North America Latin America Europe Central Asia & CIS Middle East & North Africa Sub-Saharan Africa South Asia East Asia Southeast Asia Oceania
Moderate Minor
East Asia Moderate
Sub-Saharan Africa Minor
North America Not present
Latin America Not present
Europe Not present
Central Asia & CIS Not present
Middle East & North Africa Not present
South Asia Not present
Southeast Asia Not present
Oceania Not present

Moderate presence in East Asia; Minor presence in Sub-Saharan Africa; no recorded presence in North America, Latin America, Europe, Central Asia & CIS, Middle East & North Africa, South Asia, Southeast Asia, and Oceania.

Cell & System Architecture

Cell chemistry

Lithium-ion Sodium-ion

Cell format

Prismatic Pouch Cylindrical

Battery Management System

Great Power’s BMS monitors battery status in real time, balances cells, warns of faults, and protects against overcharge, overdischarge, overvoltage, and overheating. Its energy storage platform tracks battery performance across the life of the system and provides 24/7 battery health monitoring through its cloud system.

Management Systems (ISO)

ISO 9001 ISO 14001 ISO 45001

The BESS vendor possesses the ISO certificates Quality Management (ISO 9001), Environmental Management (ISO 14001) and Occupational Safety (ISO 45001).

ESG & Sustainability

Great Power cites BloombergNEF’s 2024 Tier 1 energy storage manufacturer recognition and says its battery and energy storage products support emissions cuts.

Market Price Estimate

No modelled range is published for this product yet.

Financial Health

Bankability influence Neutral

Derived from the five sub-metrics below: 3 moderate · 1 suboptimal · 1 healthy.

Balance-sheet strength Moderate
Profitability Moderate
Leverage Moderate
Liquidity Suboptimal
Cash-flow risk Healthy

Corporate & Listing

Exchange listing 300438.SZ

Reference Project

Project Exmore battery energy storage facility; near A&N Electric Cooperative’s substation, Exmore, Virginia, United States
Coordinates 37.53181° N, 75.82299° W

Recent Developments

Great Power began mass production of its Ultra 587Ah energy storage cells at Phase II of its Quzhou Zero-Carbon Factory, expanding capacity for utility-scale BESS deliveries.

Members

The rest of this vendor profile is for members

Create a BESSBASE.com account to open and compare full vendor details. No subscription fee. Access is immediate.

Compare to Other Vendors

All vendors
VendorTierHQCapacityCompare
Great PowerTier-2Guangzhou, China20+ GWhThis vendor
1stessTier-2Shenzhen, China0.2-1 GWh
Absen EnergyTier-2Shenzhen, China2-20 GWh
ACDC New EnergyTier-2Suzhou, China0.2-1 GWh
AlphaESSTier-2Nantong, China0.2-1 GWh

How to Read the Great Power Vendor Page

This profile of Great Power is assembled exclusively from public data to support early-stage screening. Main source: greatpower.net

BESSBASE analyzes the published financials of Great Power on a quarterly basis to produce the Financial Health Scorecard. The scorecard for Great Power is Neutral, based on the cumulative score of five components: Balance-sheet strength Moderate, Profitability Moderate, Leverage Moderate, Liquidity Suboptimal, and Cash-flow risk Healthy. The BESSBASE Research Team estimates all five components from the latest public financial statements of Great Power, assessed relative to peers and corporate structure.

The Neutral score indicates that the BESSBASE Research Team does not find a clear basis for either a favorable or an unfavorable view on the manufacturer's financials. The Financial Health Scorecard is not a direct proxy for the bankability rating for Great Power energy storage products. It may form one input among others in a bankability assessment, or it may not, depending on the lender, project structure, and other factors.

Tier-2 is assigned when the BESSBASE Research Team cannot validate from public data that the energy storage products of Great Power robustly and repetitively obtain external financing from major financial institutions.

The BESSBASE Vertical Integration scorecard for Great Power is High. It reflects the assessment of the supplier's production capabilities of the key Technology & Supply Chain components: PCS, Energy Management Software, Battery Management Software, and Battery Cell.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

Report an error

BESSBASE

BESSBASE is a screening intelligence platform used by asset owners, developers, and banks to assess industrial and grid-scale battery storage solutions.

  • X
  • LinkedIn

© 2026 BESSBASE.com by BESSBASE LLC. All rights reserved.