Sineng Electric

Tier-2Listed Company

si-neng.comUpdated Sep 26, 2026

Tier-2Listed CompanyUpdated Sep 26, 2026
Compare

Annual production capacity

0.2-1GWh/yr

Bankability influence

Overall Positive

How the supplier's financials affect its products' bankability

Company Size

Large

1000-10000 headcount

Vertical integration

Medium

In-house production of key components

Company Overview

Sineng Electric, founded in 2012 and based in Wuxi, China, added a Wuxi power electronics plant in 2016 with 20 GW of annual capacity. In 2026, it entered Poland for the first time through local partners.

Headquarters

Wuxi, China

Legal entity

Sineng Electric Co., Ltd.

IPP / offtaker customers

Adani Group

Integration footprint

China, United States, Malaysia

Adjacent product lines

PV System, Digital Power System, hydrogen energy sector

Major Shipment Regions
North AmericaLatin AmericaEuropeCentral Asia & CISMiddle East & North AfricaSub-Saharan AfricaSouth AsiaEast AsiaSoutheast AsiaOceania
Moderate
Sub-Saharan Africa Moderate
East Asia Moderate
North America Not present
Latin America Not present
Europe Not present
Central Asia & CIS Not present
Middle East & North Africa Not present
South Asia Not present
Southeast Asia Not present
Oceania Not present

Moderate presence in Sub-Saharan Africa and East Asia; no recorded presence in North America, Latin America, Europe, Central Asia & CIS, Middle East & North Africa, South Asia, Southeast Asia, and Oceania.

Cell & System Architecture

Battery Management System

Sineng Electric’s C&I solution uses rack-level battery management to improve performance and extend battery life. Its utility-scale system fixes state-of-charge imbalances between battery clusters and supports periodic battery calibration.

Certifications

ESG & Sustainability

Sineng Electric’s ESG report says a third party reviewed it and measured cradle-to-gate carbon footprints for its inverter products. It also says the company chose recyclable products and packaging, reused solid waste and packaging, and checked supplier ESG through procurement, due diligence, and environmental performance reviews.

Market Price Estimate

No modelled range is published for this product yet.

Financial Health

Bankability influenceOverall Positive

Derived from the five sub-metrics below: 3 healthy · 2 moderate.

Balance-sheet strengthHealthy
ProfitabilityHealthy
LeverageModerate
LiquidityHealthy
Cash-flow riskModerate

Corporate & Listing

Exchange listing300827.SZ

Reference Project

ProjectBurgas BESS ; Burgas, Bulgaria

Recent Developments

Sineng Electric supplied 6.9 MW central PCS MV turnkey stations for Bulgaria’s 150 MW/300 MWh Burgas BESS, Eastern Europe’s largest operating battery storage facility.

Members

The rest of this vendor profile is for members

Create a BESSBASE.com account to open and compare full vendor details. It is free and fast.

Compare to Other Vendors

All vendors
VendorTierHQCapacityCompare
Sineng ElectricTier-2Wuxi, China0.2-1 GWhThis vendor
Absen EnergyTier-2Shenzhen, China2-20 GWh
AlphaESSTier-2Nantong, China0.2-1 GWh
AmpaceTier-2Xiamen, China0.2-1 GWh
CNTETier-2Fuzhou, China0.2-1 GWh

How to Read the Vendor Page

This profile of Sineng Electric is assembled exclusively from public data to support early-stage screening and requires additional due diligence.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

BESSBASE.COM

Your trusted database of battery energy storage systems

© 2026 BESSBASE.com. All rights reserved.