A blank is not zero
A blank cell means the figure was absent from the public datasheets. It is never stored as zero, and it drops to the bottom of a sort in either direction.
Procurement, development, EPC and project-finance teams use BESSBASE.com to browse and filter our BESS catalogue.
The page allows users to filter BESS units on energy capacity (MWh, kWh), chemistry, duration and enclosure type (20 ft, 10 ft and 40 ft BESS containers and cabinets).
Every listed BESS product’s specifications page carries publicly disclosed technical datasheet values for comparison. A missing value does not necessarily mean that a particular battery system lacks that capability.
Browse and filter our comprehensive database of battery energy storage system products.
| Compare | Logo | Battery Cell | Open | |||||
|---|---|---|---|---|---|---|---|---|
| HANCHU ESS | CESS-418K-S DC Block · cabinet | 0.42 MWh | — | — | LFP 280 Ah · Prismatic | |||
| HANCHU ESS | HANCHU CESS-418S-H DC Block · cabinet | 0.42 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-105K215AL AC Block · cabinet | 0.22 MWh | 0.1 MW AC | — | LFP 280 Ah · Prismatic | |||
| HANCHU ESS | CESS-HV-9.4K (12 modules) DC Block · cabinet | 0.11 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (11 modules) DC Block · cabinet | 0.1 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (10 modules) DC Block · cabinet | 0.09 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (8 modules) DC Block · cabinet | 0.08 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (9 modules) DC Block · cabinet | 0.08 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (7 modules) DC Block · cabinet | 0.07 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (6 modules) DC Block · cabinet | 0.06 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (5 modules) DC Block · cabinet | 0.05 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (4 modules) DC Block · cabinet | 0.04 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K DC Block · cabinet | 0.03 MWh | — | — | LFP |
Showing 1-13 of 13 products
A blank cell means the figure was absent from the public datasheets. It is never stored as zero, and it drops to the bottom of a sort in either direction.
Each count shows how many BESS units would remain if you added that constraint to the ones already set. Options with a count of zero stay visible.
The energy column is the nameplate BESS MWh of one unit, taken from published specifications. It is not the size of a project.
Use this catalogue to shortlist equipment from public information. The rows are a screening list for your own review.
Confirm ratings and commercial terms with the manufacturer and your project stakeholders, and record what you agree upon before you order.
BESSBASE is a screening intelligence platform used by asset owners, developers, and banks to assess industrial and grid-scale battery storage solutions.
© 2026 BESSBASE.com by BESSBASE LLC. All rights reserved.