Annual production capacity
2-20 GWh/yr
Bankability influence
Neutral
How the supplier's financials affect its products' bankability
Company Size
Large
1000-10000 headcount
Vertical integration
Minimal
In-house production of key components
Company Overview
Founded in 2018, HANCHU ESS is a BESS manufacturer based in Wuxi, Jiangsu, China. It has delivered more than 3 GWh of energy storage systems, runs solar-storage power stations totaling 3 GWh, reports annual production capacity above 8 GWh, and supplies storage systems for residential, commercial and industrial, and utility uses.
Headquarters
Wuxi, China
Legal entity
Jiangsu Hanchu Energy Technology Co., Ltd.
Integration footprint
China,Vietnam
Adjacent product lines
HC-EV-AC-07K/11K/22K-S0/S1 AC EV Charger, HESS-Gateway-M1
Major presence in Europe and Sub-Saharan Africa; Moderate presence in East Asia; Minor presence in North America; no recorded presence in Latin America, Central Asia & CIS, Middle East & North Africa, South Asia, Southeast Asia, and Oceania.
Cell & System Architecture
Cell chemistry
Named chemistries
Block architecture
Application segments
HANCHU ESS’s BMS tracks battery voltage, current, and temperature in real time. Its iESS 4.0 platform manages battery health.
Product & Safety Standards
Market Price Estimate
Financial Health
Derived from the five sub-metrics below: all five neutral.
Corporate & Listing
Notable Shareholder
Jiangsu Fruit Next Technology Co.
Notable Shareholder of HANCHU ESS is Jiangsu Fruit Next Technology Co..
Reference Project
Recent Developments
HANCHU ESS launched the 16 kWh HOME-ESS-LV-16K-S low-voltage residential battery for the African market and showed its larger utility-scale, commercial and industrial, and residential lineup, including the iESS4.0 energy management platform.
The rest of this vendor profile is for members
Create a BESSBASE.com account to open and compare full vendor details. No subscription fee. Access is immediate.
HANCHU ESS Storage Products
13| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
Commercial & industrial BESS 13 | ||||||||
| HANCHU ESS | CESS-418K-S DC Block · cabinet | 0.42 MWh | — | — | LFP 280 Ah · Prismatic | |||
| HANCHU ESS | HANCHU CESS-418S-H DC Block · cabinet | 0.42 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-105K215AL AC Block · cabinet | 0.22 MWh | 0.1 MW AC | — | LFP 280 Ah · Prismatic | |||
| HANCHU ESS | CESS-HV-9.4K (12 modules) DC Block · cabinet | 0.11 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (11 modules) DC Block · cabinet | 0.1 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (10 modules) DC Block · cabinet | 0.09 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (8 modules) DC Block · cabinet | 0.08 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (9 modules) DC Block · cabinet | 0.08 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (7 modules) DC Block · cabinet | 0.07 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (6 modules) DC Block · cabinet | 0.06 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (5 modules) DC Block · cabinet | 0.05 MWh | — | — | LFP | |||
| HANCHU ESS | CESS-HV-9.4K (4 modules) DC Block · cabinet | 0.04 MWh | — | — | LFP | |||
Compare to Other Vendors
All vendors| Vendor | Tier | HQ | Capacity | Compare |
|---|---|---|---|---|
| Tier-2 | Wuxi, China | 2-20 GWh | This vendor | |
| Tier-2 | Shenzhen, China | 0.2-1 GWh | ||
| Tier-2 | Shenzhen, China | 2-20 GWh | ||
| Tier-2 | Suzhou, China | 0.2-1 GWh | ||
| Tier-2 | Nantong, China | 0.2-1 GWh |
How to Read the HANCHU ESS Vendor Page
This profile of HANCHU ESS is assembled exclusively from public data to support early-stage screening. Main source: hanchuess.com
BESSBASE analyzes the published financials of HANCHU ESS on a quarterly basis to produce the Financial Health Scorecard. The scorecard for HANCHU ESS is Neutral, because the BESSBASE Research Team does not have the estimates for non-public BESS manufacturers.
The Financial Health Scorecard is not a direct proxy for the bankability rating for HANCHU ESS energy storage products. It may form one input among others in a bankability assessment, or it may not, depending on the lender, project structure, and other factors.
Tier-2 is assigned when the BESSBASE Research Team cannot validate from public data that the energy storage products of HANCHU ESS robustly and repetitively obtain external financing from major financial institutions.
The BESSBASE Vertical Integration scorecard for HANCHU ESS is Minimal. It reflects the assessment of the supplier's production capabilities of the key Technology & Supply Chain components: PCS, Energy Management Software, Battery Management Software, and Battery Cell.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.