Annual production capacity
0.2-1 GWh/yr
Bankability influence
Neutral
How the supplier's financials affect its products' bankability
Company Size
Small
1-300 headcount
Vertical integration
Minimal
In-house production of key components
Company Overview
E-HUB energy is a BESS provider based at Spółdzielcza 10, Legnica, Poland. The company operates under the E-HUB energy brand and focuses on battery storage systems.
Headquarters
Legnica, Poland
Legal entity
E-HUB BESS
Integration footprint
Poland
Major presence in Central Asia & CIS; Moderate presence in Europe; Minor presence in North America, Latin America, and Southeast Asia; no recorded presence in Middle East & North Africa, Sub-Saharan Africa, South Asia, East Asia, and Oceania.
Cell & System Architecture
Cell chemistry
Named chemistries
Block architecture
Application segments
E-HUB uses a three-level BMS architecture across pack, rack, and system levels. The BMS tracks state of charge and battery health for modules and racks, and it connects with the EMS and PCS to manage operating modes.
Product & Safety Standards
Market Price Estimate
Financial Health
Derived from the five sub-metrics below: all five neutral.
Reference Project
Recent Developments
E-HUB launched the Cabinet 261k, a 261 kWh commercial and industrial BESS cabinet with 125 kW output, liquid cooling, integrated aerosol fire suppression, IP54 protection, and peak-load management.
The rest of this vendor profile is for members
Create a BESSBASE.com account to open and compare full vendor details. No subscription fee. Access is immediate.
E-HUB Storage Products
5| Compare | Logo | Vendor | System | Energy | Power | Duration | Battery Cell | Open |
|---|---|---|---|---|---|---|---|---|
Commercial & industrial BESS 2 | ||||||||
| E-HUB | Cabinet 418k AC Block · cabinet | 0.42 MWh | 0.22 MW AC | — 0.5C | LFP 314 Ah · Prismatic | |||
| E-HUB | Cabinet 261k AC Block · cabinet | 0.26 MWh | 0.13 MW AC | — 0.5C | LFP 314 Ah · Prismatic | |||
Grid-Scale BESS 3 | ||||||||
| E-HUB | Container 5.0M AC Block · 20 ft container | 5.02 MWh | 2.5 MW AC | 2 h 0.5C | LFP 314 Ah · Prismatic | |||
| E-HUB | Container 4.2M AC Block · 20 ft container | 4.18 MWh | 2 MW AC | 2 h 0.5C | LFP 314 Ah · Prismatic | |||
| E-HUB | Container 2.5M AC Block · 20 ft container | 2.51 MWh | 1.25 MW AC | — 0.5C | LFP 314 Ah · Prismatic | |||
Compare to Other Vendors
All vendors| Vendor | Tier | HQ | Capacity | Compare |
|---|---|---|---|---|
| Tier-2 | Legnica, Poland | 0.2-1 GWh | This vendor | |
| Tier-2 | Shenzhen, China | 0.2-1 GWh | ||
| Tier-2 | Shenzhen, China | 2-20 GWh | ||
| Tier-2 | Suzhou, China | 0.2-1 GWh | ||
| Tier-2 | Nürtingen, Germany | 2-20 GWh |
How to Read the E-HUB Vendor Page
This profile of E-HUB is assembled exclusively from public data to support early-stage screening. Main source: e-hub-bess.com
BESSBASE analyzes the published financials of E-HUB on a quarterly basis to produce the Financial Health Scorecard. The scorecard for E-HUB is Neutral, because the BESSBASE Research Team does not have the estimates for non-public BESS manufacturers.
The Financial Health Scorecard is not a direct proxy for the bankability rating for E-HUB energy storage products. It may form one input among others in a bankability assessment, or it may not, depending on the lender, project structure, and other factors.
Tier-2 is assigned when the BESSBASE Research Team cannot validate from public data that the energy storage products of E-HUB robustly and repetitively obtain external financing from major financial institutions.
The BESSBASE Vertical Integration scorecard for E-HUB is Minimal. It reflects the assessment of the supplier's production capabilities of the key Technology & Supply Chain components: PCS, Energy Management Software, Battery Management Software, and Battery Cell.
Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.