Ford Energy

Tier-2Listed Company

fordenergy.comUpdated Sep 13, 2026

Tier-2Listed CompanyUpdated Sep 13, 2026
Compare

Annual production capacity

2-20GWh/yr

Bankability influence

Neutral

How the supplier's financials affect its products' bankability

Company Size

Small

1-300 headcount

Vertical integration

High

In-house production of key components

Company Overview

Ford Energy, a wholly owned Ford Motor Company subsidiary introduced in 2026, focuses on U.S.-assembled battery energy storage systems for utilities, data centers, and large industrial and commercial customers. It is repurposing battery manufacturing capacity in Glendale, Kentucky, and plans to deploy at least 20 GWh a year, with first customer deliveries set for late 2027.

Headquarters

United States

Legal entity

Ford Energy

IPP / offtaker customers

EDF power solutions North America

Adjacent product lines

residential storage, EV charging, home charging and installation, energy solutions, home backup power, Ford Energy Rewards

Major Shipment Regions
North AmericaLatin AmericaEuropeCentral Asia & CISMiddle East & North AfricaSub-Saharan AfricaSouth AsiaEast AsiaSoutheast AsiaOceania
Major Moderate
North America Major
Europe Major
Middle East & North Africa Major
East Asia Major
Southeast Asia Major
Oceania Major
Latin America Moderate
South Asia Moderate
Central Asia & CIS Not present
Sub-Saharan Africa Not present

Major presence in North America, Europe, Middle East & North Africa, East Asia, Southeast Asia, and Oceania; Moderate presence in Latin America and South Asia; no recorded presence in Central Asia & CIS and Sub-Saharan Africa.

Cell & System Architecture

Cell format

Prismatic

Named chemistries

LFP

Block architecture

DC Block

Application segments

Grid-Scale

Battery Management System

Ford Energy’s three-level BMS tracks voltage, current, temperature, state of charge, and state of health. It supports stable operation.

Certifications

Management Systems (ISO)

ISO 9001ISO 14001

Product & Safety Standards

UL1973UL9540UL9540ANFPA855

ESG & Sustainability

Ford Energy targets carbon neutrality by 2050. Science-based targets cover vehicles, operations, and its supply chain, which make up about 95% of its CO2 emissions, and Vigeo Eiris gave its sustainable financing framework an "Advanced" second-party opinion.

Market Price Estimate

Financial Health

Bankability influenceNeutral

Derived from the five sub-metrics below: 3 suboptimal · 1 moderate · 1 healthy.

Balance-sheet strengthSuboptimal
ProfitabilitySuboptimal
LeverageSuboptimal
LiquidityModerate
Cash-flow riskHealthy

Corporate & Listing

Parent Company

Ford Motor Company

F

Parent Company of Ford Energy is Ford Motor Company. Ford Energy is not separately listed; the exchange listing belongs to the other legal entity.

Share price of Ford Motor Company (F), not Ford Energy.

Reference Project

ProjectFord Energy DC Block ; Glendale, Kentucky, United States
Coordinates37.57260° N, 85.15514° W

Recent Developments

Ford Energy signed a five-year supply deal with EDF power solutions North America for up to 4 GWh a year of DC Block battery energy storage systems, with deliveries that could reach 20 GWh starting in 2028.

Members

The rest of this vendor profile is for members

Create a BESSBASE.com account to open and compare full vendor details. It is free and fast.

Ford Energy Storage Products

2
CompareLogoVendorSystemEnergyPowerDurationBattery CellOpen

Grid-Scale BESS 2

Ford Energy
FE-450DC Block · 20 ft container
5.45MWh—4h0.25CLFP512 Ah · Prismatic Next-Gen 500+ Ah
Ford Energy
FE-250DC Block · 20 ft container
5.45MWh—2h0.5CLFP512 Ah · Prismatic Next-Gen 500+ Ah

Compare to Other Vendors

All vendors
VendorTierHQCapacityCompare
Ford EnergyTier-2United States2-20 GWhThis vendor
CumminsTier-2Columbus, United States1-2 GWh
DynapowerTier-2South Burlington, United States0.2-1 GWh
EPC PowerTier-2Poway, United States2-20 GWh
LG Energy Solution VertechTier-2Westborough, United States20+ GWh

How to Read the Vendor Page

This profile of Ford Energy is assembled exclusively from public data to support early-stage screening and requires additional due diligence.

Always confirm these terms and technical specifications directly with the vendor and project stakeholders. Reflect all agreed-upon details in the legal agreements before making any investment decisions.

BESSBASE.COM

Your trusted database of battery energy storage systems

© 2026 BESSBASE.com. All rights reserved.